Endosmart Plus

(1 reviews)
Estimate Shipping Time: 5 Days
Brand
DBA
Warranty
24 Months

Inhouse product


Price
LE20,000.00 /Device
Quantity
(In stock)
Total Price
Share
Top Selling Products

Reviews & Ratings

5 out of 5.0
(1 reviews)
  • ahmed Elwan

    02-10-2024

    best device ever

Endo Smart +: Revolutionize Your Root Canal Experience

Introducing the Endo Smart +, the next generation Brushless Endo Motor designed to bring unparalleled precision, efficiency, and comfort to your root canal treatments.

Experience the power of a high-performance system engineered for the modern endodontist.

Unrivaled Performance & Precision

  • High Performance Brushless Motor: Feel the difference with a super high torque, high-speed motor that delivers faster response, more accurate output, and exceptional stability for the most efficient and safe canal preparation.

    • Speed Range:

    • Torque Range:

  • Adjustable Reciprocation: Optimize your filing with an Adjustable Reciprocating Angle from 20∘ to 400∘, adjustable in 10∘ intervals. This accurate rotating angle dramatically reduces the risk of instrument fracture while enabling superior preparing efficiency.

  • Super Mini Contra-Angle: The Super Mini Contra-Angle provides a significantly clearer operation field, giving you better visibility and control.

Integrated Safety with Combined Length Determination

  • Smart Apex Connection: The Endo Smart + seamlessly connects to a matched Apex Locator (like the DPEX V shown) to activate the Combined Length Determination Mode.

  • Automated Safety Functions: Once connected, the system monitors the file tip position inside the canal in real-time and enables critical automatic functions for enhanced safety:

    • Auto Apical Reverse/Stop: Protects against over-instrumentation by automatically reversing or stopping the file upon reaching the set apical point.

    • Auto Start/Stop: Begins and ceases rotation when the file is inserted or withdrawn from the canal.

    • Auto Apical Slow Down: Automatically slows the file's speed as it approaches the apex for ultimate control.

Superior Comfort for Doctor and Patient

  • Quiet and Smooth Operation: Thanks to the advanced brushless motor technology, the Endo Smart + delivers smooth rotation with lower noise and minimal handpiece vibration compared to traditional brush motors.

  • Enhanced Experience: Doctors benefit from a better feel during operations, and patients enjoy a noticeably more comfortable and reassuring experience.

Upgrade your practice with the Endo Smart + and step into a new era of high-precision, low-stress endodontics

Frequently Bought Products

Product Queries (0)

Login Or Registerto submit your questions to seller

Other Questions

No none asked to seller yet

Top Selling Products